| |
|
|
|
|
North Carolina State
University Wendell H. Murphy
Football Operations Center at Carter-Finley Stadium
Raleigh, NC
|
Architect: Corley Redfoot Zack
Chapel Hill, NC
|
|
General
Contractor: T.A. Loving Company
Goldsboro, NC
|
|
 |
|
Material: 4mm Reynobond ACM dry-
seal panels with PVDF finishes;
Tubelite aluminum curtainwall and
storefront systems with Viracon
glass products. |
 |
|
The architects for
this high-tech structure received a National First
Place Award from
Metal Architecture in 2003 for their design with
metal inside and out. The extremely flat aluminum
composite panels with reveal joints give the facade
a highly machined appearance that is reflective of
the university's engineering reputation.
|
|
|
|
Sphinx
Pharmaceutical Research & Development
Facility
Research Triangle Park, NC
|
|
|
 |
Architect: O’Brien Atkins Associates
Research Triangle Park, NC
|
General
Contractor: Suitt Construction Company
Raleigh, NC |
|
|
|
|
| |
 |
Material: Centria Dimension Series Formawall
H factory-insulated panel system, Centria
Horizontal Profile siding panels, and
Centria/CS Group integrated louvers all with
PVDF finishes. |
|
|
|
| |
A national
design-build award was presented to the general
contractor for Best Design-Build Project in the
Private Sector over $15 million category. The
custom white and silver smooth metal wall panels clearly create a lasting impression
for this modern facility.
|
|
|
|
|
Indiana
Fastener Corporation
Greenfield, IN
|
|
|
|
Design-Build
General Contractor: Kajima International
Schaumburg, IL
|
 |
| |
|
|
Material: Mfg plant has 3” deep field
assembled insulated siding panels with
vertical
and horizontal flush profile
panels. 2” factory-insulated
steel wall
panels in 2 PVDF colors on office
building.
|
 |
|
|
|
| |
|
This design-build industrial project is
exceptional for its attention to details.
The use of two different profiles and colors for
cladding the fastener plant was
upstaged only by an adjacent office structure
with two colors of smooth, curved
panels and glass.
|
|
|
|
|
UNC Hospitals
Wellness Center
Chapel Hill, NC
|
|
|
 |
Architect: Corley Redfoot Zack
Chapel Hill, NC |
General
Contractor: Resolute Building Company
Chapel Hill, NC |
|
|
|
| |
 |
Material: Vistawall aluminum curtainwall
and storefront systems with AFGD glass.
|
|
|
| |
|
Sweeping curves
and angles combine with varying elevation
heights, shapes
and off-sets to produce dramatic results for a health/sports complex
worthy of a UNC
location. This dynamic glass and metal design achieved its goal.
|
|
|
| |
North American
Stainless
Ghent, KY
|
|
|
Engineer/
Architect: Datel Engineering Company
Dayton, OH
|
Direct Roofing
& Siding Contractor: SPS Corporation
|
|
 |
|
 |
Material: Centria Style Rib metal wall panels with
Deep Blue Sea PVDF color, Resolite 7.2 Rib
translucent wall panels, SPS K316 continuous metal
roof panel system, and Centria Gravity Ventilators.
|
|
| |
|
|
|
This
massive industrial complex has
been ongoing since 1990. To date, SPS
has installed over 2.2 million sq. ft. of
K316 standing seam roof system, 1.35
million sq. ft. of Centria Style Rib metal
siding panels, 950,000 sq. ft. of Resolite
translucent siding, and 3,600 linear feet
of Gravity Ventilators.
|
 |
|
|
|
|